Klikov PVPP

The power plant is built on a brownfield after the demolition of a bankrupt pig farm.
The power plant is built on a brownfield after the demolition of a bankrupt pig farm.
A power plant with minimal grass cutting costs. A flock of sheep takes care of keeping the place neat and tidy.
The PV power plant is divided by a road into two separate units.
The PVPP building is directly connected to the village of Roudné.
In the vicinity of the power plant there is a 400 kV HV line, which connects the Temelín nuclear power plant to the Czech distribution network.
The construction of a wind power plant was originally considered in this locality due to the good wind conditions.
The first civic power plant in the Czech Republic. Hundreds of citizens from Rozstání and the surrounding area expressed an interest in buying shares in the company that owns the project before the construction of the power plant.
The most powerful power plant in the whole of the Czech Republic, it produces the most electricity per unit of output.
It is the largest of our power plants.